Resource Planner – Fields Below Resource Name
Submitted by Rosalie Chassat (Klient) · Mar 17, 2026Allow customization of fields displayed under resource names in the planner. (10 votes)
Share your ideas, vote for others, and leave comments to help shape the future of Klient PSA
Allow customization of fields displayed under resource names in the planner. (10 votes)
Keep time off visible but exclude it from project hour totals for accurate allocation views. (7 votes)
Allow switching between AND/OR logic when filtering resources by multiple skills. (8 votes)
We would like to be able to assign a resource to a checklist item.
Desired Outcome:
We would like to be able to assign a project resource to a checklist line.
Add the ability to create a temporary gap in a resource’s task assignment, then resume the same assignment later without changing the role or rebuilding the schedule. This would make it easier to handle short-term unavailability without disrupting the rest of the plan.
Allow users to define and persist a custom column order for Project Assignments in the Workspace Assignment view so it remains consistent after refreshes and updates. This removes the need to repeatedly reorder columns and improves usability on complex projects.
Enable a draft mode to test resource allocation scenarios without impacting live schedules. (9 votes)
Prevent manual scheduling changes from being overwritten by automatic recalculations. (7 votes)
Title: Dynamic Holiday Hours Based on Resource Work Schedules
Category: Resource Management
What problem does this solve?
Today, when I try to set up holiday calendars for resources with different work schedules, I cannot input a single value in hours that would be accurate for both full-time and part-time employees. This requires creating multiple versions of regional holiday calendars, which is time-consuming and prone to errors.
What would the ideal solution look like?
I would like to be able to set a '% of Regular Work Schedule' field in the holiday calendar setup. This field would automatically calculate holiday hours based on each resource's predefined work schedule. For example, if set to 100%, a resource with an 8-hour/day schedule would automatically get 8 hours for the holiday, while a resource with a 4-hour/day schedule would get 4 hours.
Current workaround (optional)
Create multiple versions of regional holiday calendars for different work schedules.
🤖 Submitted via SCOPEY on 4/17/2026
Title: Dark Theme Mode for Resource Planner
Category: Resource Management
What problem does this solve?
Today, when I try to use the Resource Planner, I cannot because there is no dark theme option, which makes it difficult to work in low-light environments or for users who prefer a darker interface for better visibility and reduced eye strain.
What would the ideal solution look like?
I would like to be able to enable a dark theme mode for the Resource Planner that applies to all users by default.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 2026-05-13
Title: Add "Project Manager" filter to Resource Planner
Category: Resource Management
What problem does this solve?
Today, when I try to filter projects in the Resource Planner, I cannot narrow them down by specific project managers. This makes it difficult to focus on projects managed by a particular person.
What would the ideal solution look like?
I would like to be able to filter projects in the Resource Planner by selecting a specific project manager, so I can view only the projects they are managing.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 6/22/2026
Title: Bulk remove assignees from selected tasks
Category: Resource Management
What problem does this solve?
Today, when I try to remove assignees from multiple tasks, I cannot because I have to manually click the 'x' on each assignee name in the schedule tab for every task.
What would the ideal solution look like?
I would like to be able to bulk remove assignees from selected tasks in one action.
Current workaround (optional)
Manually clicking the 'x' on each assignee name in the schedule tab for every task.
🤖 Submitted via SCOPEY on 6/3/2026
In the Resource Plan, system does not accept an update to monthly forecast if the task spans more than the month.
Desired Outcome:
Need the ability to update Scheduled hours in monthly buckets regardless of the task span. If a task spans more than a month, then the number of hours being entered should be ingested for that month only.
Current Workaround:
Enter Scheduled hours in weekly buckets.
Ensure task-related skills are copied when creating projects from templates. (9 votes)
Title: Add "Disable All Validation Messages for Placeholders" Checkbox
Category: Resource Management
What problem does this solve?
Today, when I try to manage placeholder resources, I cannot do so efficiently because validation messages frequently interrupt the workflow, especially in high-demand scenarios.
What would the ideal solution look like?
I would like to be able to enable a checkbox labeled "Disable All Validation Messages for Placeholders" on project resources. This would suppress all validation messages related to placeholders, such as exceeding scheduled or available hours, allowing for uninterrupted management of placeholders.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 6/18/2026
Title: Exclude 'Cancelled' tasks from active views and scheduling
Category: Resource Management
What problem does this solve?
Today, when I try to manage tasks with a "Cancelled" status, I cannot because they still appear in active-task filters and the Resource Planner. This causes issues with scheduled hours, time entries, and budget indicators, leading to inaccurate capacity and financial tracking.
What would the ideal solution look like?
I would like to be able to exclude "Cancelled" tasks from the active-task filter and Resource Planner scheduling, ensuring that budgets and capacity remain accurate while preserving the historical record.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 8/12/2026
Display holidays in the workspace timeline based on project holiday schedules. (8 votes)
The Global Workspace provides an excellent consolidated view of projects but is currently limited to view-only access. Project Managers responsible for multiple projects must open each project individually to update schedules, statuses, dates, risks, effort, or other project information. Managers and PMO leaders also lack the ability to quickly support teams by making updates or reviewing and correcting information across multiple projects from a single location.
Desired Outcome:
llow authorized users to edit selected fields directly from the Global Workspace. Support inline editing, bulk updates, multi-project selection, and configurable permissions to control which fields can be modified. Managers should be able to view and update key project information across all projects they oversee, improving portfolio visibility, governance, and data quality while reducing administrative effort.
Current Workaround:
Users must open each project individually to make updates, even when the same change applies to multiple projects. Managers rely on reports, dashboards, and separate project reviews to identify issues and support their teams. This creates additional effort, slows updates, and makes portfolio-level management less efficient.
Automatically highlight overdue tasks directly in the workspace when start dates are past and tasks are incomplete. (8 votes)
Users can accidentally modify the task structure in Workspace and cannot easily revert their changes. Examples include: Indent / Outdent actions Moving tasks within the Workspace Reorganizing task hierarchies This can lead to lost time and frustration when trying to manually restore the original structure.
Desired Outcome:
Introduce an Undo / Redo feature that allows users to quickly reverse recent actions. Supported actions could include: Indent / Outdent Task moves and drag-and-drop actions Hierarchy changes Task creation and deletion Keyboard shortcuts (Ctrl+Z / Ctrl+Y) would further improve usability.
Current Workaround:
Users must manually: Move tasks back to their original position Rebuild task hierarchies Reapply indentation levels This is time-consuming, especially on larger project plans. Business Value Reduces user errors Saves time Improves user confidence Enhances the Workspace experience Aligns with standard functionality found in modern planning tools Priority: High Impact: High frequency usability improvement for project teams.
Project Managers often need to update multiple tasks at the same time following scope changes, resource adjustments, revised estimates, or planning updates. Currently, task durations, effort, dates, and assignments must be reviewed and updated individually, making large schedule updates time-consuming and increasing the risk of inconsistencies across the project plan.
Desired Outcome:
Allow users to perform bulk updates on selected tasks and apply changes across one or multiple activities simultaneously. Users should be able to update duration, effort, planned hours, start dates, finish dates, assignments, calendars, and task status for multiple tasks at once. The system should automatically recalculate impacted schedules, dependencies, and resource demand based on the changes. Before applying updates, users should be able to preview the impact and confirm the modifications.
Current Workaround:
Project Managers must manually update tasks one at a time, recalculate dates and effort individually, and validate downstream impacts after each change. For large projects, schedule revisions can require significant effort and increase the likelihood of missed updates or inconsistent planning data.
Title: Ability to mass move/copy tasks between projects
Category: Project Management
What problem does this solve?
Today, when I try to move or copy multiple tasks from one project to another, I cannot because there is no functionality to do this in bulk. This is especially needed for managing tasks logged as Parking Lot items during an implementation project, which need to be moved to a new project for the same account after the implementation is complete.
What would the ideal solution look like?
I would like to be able to select multiple tasks and either move or copy them to another project in bulk, ensuring that task details and associations are preserved.
Current workaround (optional)
Manually recreating tasks in the new project.
🤖 Submitted via SCOPEY on 4/14/2026
Currently the cancelled tasks are still display when a user select the ''Active tasks'' and ''My work'' tasks filters
Desired Outcome:
We would like the cancelled tasks to be removed from those tasks views.
Current Workaround:
Creating a private view with specific filter, but should be include to the preset one so user don't have to create custom filters.
Ensure copied tasks retain assignees and automatically recreate task assignments. (11 votes)
Projects rely on task dependencies to ensure work is completed in the proper sequence. When a predecessor task finishes earlier than planned, successor task owners are not automatically informed that they may be able to start sooner. Similarly, when a predecessor task is delayed, dependent task owners are often unaware that their planned start date is no longer achievable. As a result, opportunities to accelerate project delivery are missed, delays are communicated late, and project managers must manually monitor and adjust schedules. In projects with many interrelated tasks, a single schedule change can impact multiple downstream activities, creating additional effort to identify affected tasks, communicate changes, and maintain schedule accuracy. Teams need greater visibility into dependency impacts so schedules can adapt dynamically as project conditions change.
Desired Outcome:
Implement intelligent dependency notifications and a schedule change approval workflow. When a predecessor task is completed early, delayed, or rescheduled, Klient should automatically identify impacted successor tasks and notify their owners. Rather than automatically updating dates, the system should generate a proposed schedule change based on the dependency relationship. Task owners would be able to accept the recommendation or propose alternative dates and provide comments explaining constraints or opportunities. Since task owners manage their work but the Project Manager owns the overall schedule, milestones, and delivery commitments, any proposed date change should be submitted for approval before being applied. The Project Manager would receive a change request showing the original dates, proposed dates, dependency details, and downstream impacts. The PM could approve, reject, or modify the request. Once approved, the schedule would update automatically and notify affected stak
Current Workaround:
Project managers manually review dependencies, identify impacted tasks, calculate schedule effects, adjust dates, and communicate changes through emails, chats, meetings, or comments. This process is time-consuming, difficult to scale, and increases the risk that impacted task owners are not informed quickly enough. Opportunities to start work earlier may be missed, while schedule delays may not be identified until after downstream tasks are already affected. For larger projects with numerous de
Allow color mapping for custom picklist fields to improve visual organization. (12 votes)
Title: Manual task ordering in Kanban columns
Category: Project Management
What problem does this solve?
Today, when I try to prioritize tasks in Kanban columns, I cannot because there is no way to manually order tasks and save that order for the team. Additionally, in the Global Kanban, there is no option to save a manual display order, which would allow teams to prioritize tasks within a column (e.g., "Backlog") for developers to pick the first one first.
What would the ideal solution look like?
I would like to be able to manually order tasks within Kanban columns and save that order so the entire team can see and return to it anytime. In the Global Kanban, there should also be a "manual" sort option that allows teams to save and restore a custom task order for better prioritization.
Current workaround (optional)
None mentioned.
Title: Rollup fields for revenue and cost on parent projects
Category: Project Management
What problem does this solve?
Today, when I try to track the total revenue and cost for a parent project, I cannot because there are no rollup fields that automatically include all subprojects.
What would the ideal solution look like?
I would like to be able to see rollup fields on a parent project that automatically calculate the total revenue and cost, including all associated subprojects.
Current workaround (optional)
The current workaround is to create custom fields and use custom flows or DLS (Declarative Lookup Rollup Summaries) to populate those custom fields on the parent project.
🤖 Submitted via SCOPEY on 4/23/2026
Today, when I want to track project stakeholders, I cannot because there is no dedicated way to manage and view all relevant project contacts. The current setup only allows for a few contact fields on the Project, which is insufficient for managing both internal and external stakeholders effectively.
Desired Outcome:
I would like to be able to view a comprehensive list of all relevant project stakeholders, including their roles, responsibilities, and contact information. This list should automatically include internal project resources and external contacts associated with the project.
Current Workaround:
I've done this in the past by building a custom joint object between a Project, Contacts, and Project Resources, along with flows to tie everything together, but it's complex to build to maintain an accurate list.
Add a setting to default the “notify resource” option to ON when assigning tasks, so notifications are sent automatically without manual selection. This ensures consistent communication and removes the risk of missed notifications due to human error.
Title: Expand all projects in workspace
Category: Project Management
What problem does this solve?
Today, when I try to view multiple projects in the workspace, I cannot easily expand all of them at once. This makes it time-consuming to review project details.
What would the ideal solution look like?
I would like to be able to toggle an option to expand all projects in the workspace simultaneously.
Current workaround (optional)
Manually expanding each project one by one.
🤖 Submitted via SCOPEY on 2026-03-27
Allow controlled project closure and bulk cleanup of assignments and future scheduled hours. (16 votes)
Allow viewing and editing task dependencies directly in the workspace via a predecessor column. (9 votes)
Allow users to save and reuse filtered views and layouts in Snap Workspace. (6 votes)
The export button in the project workspace is currently only available on the Gantt, Grid, and Timeline views — it's not available when users are on the Assignment view. Users who need to share assignment information with stakeholders outside the live workspace currently fall back on screenshots as a workaround. Expected behavior: the export function should be enabled on the Assignment view as well, producing a PDF that includes the assignment information visible in the view.
Title: Add Assignee Filter to Global Kanban
Category: Project Management
What problem does this solve?
Currently, there’s no way to filter tasks in the Global Kanban by assignee. This makes it difficult for managers or team members to view tasks assigned to a specific person.
What would the ideal solution look like?
Add a filter to the Global Kanban that allows users to select one assignee at a time and view only the tasks assigned to that person.
Current workaround (optional)
None mentioned
🤖 Submitted via SCOPEY on 5/12/2026
Today, when I try to be able to create a backlog without looking like I have overdue items, I cannot, as all tasks have dates.
Desired Outcome:
I would like to be able to create tasks without dates so I can add them to a backlog and be able to add dates later once we are ready to schedule.
Current Workaround:
Currently I have tasks show as overdue even though they are not.
Allow users to hide selected columns in Kanban view, even if they contain cards, for more focused workflows. (1 vote)
The predecessor field on tasks currently displays tasks in creation order with no visible WBS numbers. On projects with a large task list, this makes it very difficult to locate the right predecessor — users must scroll through an unsorted list and mentally match task names without any structural context. The dropdown's implicit search also requires an exact match, which is not intuitive and adds friction during project planning.
Desired Outcome:
1. Display WBS numbers alongside task names in the predecessor dropdown (e.g., "1.2.3 – Install Equipment"), so users can immediately identify where each task sits in the project hierarchy. 2. Sort the predecessor list by WBS order rather than task creation date, so the dropdown mirrors the logical structure of the project. 3. Replace or augment the dropdown with a search/filter input that supports partial, fuzzy, or keyword matching across both the WBS number and task name — making it fast and intuitive to find the right predecessor regardless of project size.
When copy-pasting a set of tasks, the parent/child hierarchy is flattened — subtasks land at the milestone/parent level and have to be manually re-nested one by one. A customer reported spending a full day rebuilding their largest project this way, defeating the purpose of copy-paste as a templating shortcut. Expected behavior: original hierarchy and dependencies carry over intact.
Add a target allocation line to compare planned, scheduled, and logged hours against defined goals. (4 votes)
Today, Klient supports hierarchical task structures using WBS (Work Breakdown Structure), where parent tasks (e.g., phases) contain child tasks (e.g., detailed activities). In our workflows, hours and revenue are assigned only at the subtask level, while the parent task represents a logical grouping such as a project phase. However, there is no way to aggregate expected revenue at the parent (phase) level in the same way that costs can currently be aggregated.
Desired Outcome:
The ideal solution would mirror the existing “Budgeted Cost Including Subtasks” functionality, but for revenue. Specifically: -A field that aggregates Expected Revenue from all subtasks and displays it at the parent (WBS) level -The calculation behaves identically to Budgeted Cost -Including Subtasks, requiring no change in user workflow -The value updates dynamically as tasks, hours, or rates change -The roll-up is visible directly in the workspace when working with hierarchical task structures From a user perspective: -Parent tasks (e.g., phases) would act as true financial summaries, not just organizational containers -Users could quickly understand revenue by phase without exporting or manually calculating -Cost and revenue would be consistently aligned in how they are aggregated and displayed
Current Workaround:
Today, we rely on Excel to understand revenue by phase. After the Excel spreadsheet is approved, staff will manually copy the contents to the Workspace. Ensuring the spreadsheet template is up-to-date and ensuring users are using the most recent template is the bane of my life.
Title: My Deadlines – Manager View for Team Task Oversight
Category: Project Management
What problem does this solve?
Today, when I try to view my team's task deadlines, I cannot because My Deadlines only shows the logged-in user’s own tasks. Managers need a way to quickly see overdue tasks, tasks due this week/next week, and team members who may be falling behind across a high volume of projects.
What would the ideal solution look like?
I would like to be able to view task deadlines for my team members in a manager-style version of My Deadlines, with the ability to filter by specific team members.
Current workaround (optional)
Quantilope is currently sending weekly task reminder emails to reps showing overdue tasks, what is due this week, and what is coming next. They also create a rolled-up version for managers.
🤖 Submitted via SCOPEY on 3/25/2026
Title: Remember expanded/collapsed task states in PM Workspace
Category: Project Management
What problem does this solve?
Today, when I try to minimize completed phases in the PM Workspace for better viewing, I cannot because the workspace does not remember my settings. When I return to the project, everything is expanded again. This makes the PM Workspace less user-friendly, especially for projects that have a lot of sub-tasks in earlier phases.
What would the ideal solution look like?
I would like to be able to have the PM Workspace remember the expanded or collapsed state of tasks for each user individually.
Current workaround (optional)
None mentioned
🤖 Submitted via SCOPEY on 5/21/2026
The workspace currently supports undo in many places, but there is no redo — once an action is undone, it cannot be re-applied without manually recreating it. Add a redo equivalent with a keyboard shortcut (Cmd/Ctrl+Shift+Z). Especially valuable during heavy project build-out where copy-paste, reordering, and hierarchy changes happen frequently.
Currently, when I am assigned as the Project Manager on a newly sold project, I need to manually update all Project Assignment statuses from *Soft Booked* to *Booked* for the assigned project resources. This is inefficient when managing multiple projects with many project resources.
Desired Outcome:
Mass Bulk Update the Project Assignment Status and other Project Assignment fields from the List view.
Current Workaround:
Click through each record to update it.
Title: Separate Sync Start and Sync End Controls for Projects
Category: Project Management
What problem does this solve?
Today, when I try to manage project timelines, I cannot because the Sync Dates setting only allows both the project start and end dates to be synchronized together. This creates issues for milestone-driven projects that require a fixed start date and variable end date, as well as hourly projects that require a fixed end date and variable start date. Additionally, non-billable tasks can unintentionally affect the project start date.
What would the ideal solution look like?
I would like to be able to independently toggle "Sync Start Date" and "Sync End Date" settings. This would allow me to choose whether the project start date adjusts dynamically based on the earliest task or the project end date adjusts dynamically based on the latest task.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 8/13/2026
Today, when I need to add multiple task rows under a phase in the project workspace, I have to click the plus button on the left to add a new row underneath. If I have multiple rows to add, it takes more time as I can only add one row at a time and each new task row takes time to load. The idea would be to have a button to mass create multiple rows, like in Excel, so that you can add 10 rows at a time for example.
Desired Outcome:
Perhaps this could be a "right-click" and select "add multiple rows" or something like that. Then it lets you type in a number and those new task rows would populate.
Current Workaround:
Today I add each new task row individually and wait for each to load.
On the Workspace Gantt timeline, all task dependency links (Finish-to-Start, Start-to-Start, Finish-to-Finish, Start-to-Finish) currently render as the same plain line style and color. Users can't tell what kind of relationship connects two tasks just by looking at the chart — they have to open the task or predecessor panel to check. On projects with dense scheduling networks, this makes it hard to visually audit whether the right dependency types are in place, spot miswired links, or explain the schedule logic to a client during a walkthrough.
Desired Outcome:
Color each dependency link on the Gantt timeline based on its type, with a small legend so the meaning is discoverable at a glance — for example: - Finish-to-Start (FS) — default/neutral color, solid line - Start-to-Start (SS) — distinct color, solid line - Finish-to-Finish (FF) — distinct color, solid line - Start-to-Finish (SF) — distinct color, dashed line (since it's rare/unusual) Colors should be configurable or at least consistent with the existing Workspace color system, and should render the same way across Global, Single Project, and Editable views.
Today, zooming the Workspace timeline only cycles through fixed scale presets (Day/Week/Month/etc.) via the zoom in/out buttons. There's no way to automatically fit an entire project's schedule on screen — users have to manually step through zoom levels and guess which one avoids horizontal scrolling, especially on projects with long or uneven timelines. This is a small but constant friction point whenever someone opens a project and wants an at-a-glance view of the full schedule.
Desired Outcome:
Add a "Zoom to Fit" button to the timeline toolbar, alongside the existing zoom in/out controls. One click sets the timeline to the most detailed zoom level that displays the full project without horizontal scrolling, with a way to revert to the previous zoom level.
Default files in a project template are not added to the project created from the template.
Desired Outcome:
We use templates when creating a new project. We'd like the template to include default files. When creating a new project from the template, and the expectation is that the file are included in the new project.
Would like to be able to have a different field set for a different type of task that determine what fields show up in the Detail Card while in workspace (when you hit the green pencil). Could be based on task type or maybe record type.
Desired Outcome:
when I click on a specific type of task in the workspace, a different set of fields are displayed in the detail card.
Current Workaround:
Can't work around it today.
Currently, when there's a lot of tasks section/group it's difficult to see all the group of tasks. If we could have an option that could highlighted the parent task, to have a clearer visual of the different section of the tasks. Also could the weekend could be highlighted for the whole column and not only the date header. See attachment for both examples.
Desired Outcome:
better display and visibility
Current Workaround:
We write the parent task in CAPS or bold and add gif.
When working with a project we need to view task as tabs quite often. Edit Panel on the right does not offer all fields and functionalities. As a user I would prefer to have all child objects under one umbrella (aka Tab), so that relations are clearly visible and the UI does not get cluttered.
Desired Outcome:
Open Task and Sub-Tasks and Sub-Tabs, but also offer an option (Shift+Click or something) to open them as actual tabs
Current Workaround:
Open Task, from Task open Project. The project will then be a sub task.
🚫 Problem Statement
Today, when I try to use both baselines and Snap, I cannot because there is no way to sync the two. This creates duplicate work for users who already use baselines in Workspace and are now being asked to create snaps as well.
💡 Ideal Solution
I would like to be able to sync baselines with Snap so that changes in one are reflected in the other, eliminating the need for duplicate work.
🔨 Current Workaround
None mentioned.
🤖 Submitted via SCOPEY on 3/24/2026
Title: Dynamic project bar colors in Global Workspace
Category: Project Management
What problem does this solve?
Currently, it's difficult to visually differentiate project stages or other key attributes in the Global Workspace because the project bars are not color-coded based on any field.
What would the ideal solution look like?
I would like the ability to dynamically customize the colors of project bars in the Global Workspace based on any field, such as the Klient Project Stage or other relevant fields. This would allow for greater flexibility and better visual organization.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 6/18/2026
Title: Create "Project Planner" screen for project-based planning
Category: Project Management
What problem does this solve?
Today, when I try to plan resources by project, I cannot filter by project-specific fields like stage, dates, project manager, region, or practice. The current Resource Planner can group by project, but it does not allow filtering by project fields, making it difficult for PMs and Operations to plan resources effectively.
What would the ideal solution look like?
I would like to have a 'Project Planner' screen that allows me to filter by project fields (e.g., stage, dates, project manager, region, practice) and assign resources, schedules, and modify hours directly for each project. This screen would function similarly to the Resource Planner but focus on projects instead of resources.
Current workaround (optional)
The current Resource Planner can group by project, but it does not allow filtering by project fields.
🤖 Submitted via SCOPEY on 6/22/2026
Title: Add "Unassigned" option to Assignees filter in Project Workspace
Category: Project Management
What problem does this solve?
Today, when I try to filter tasks in the Project Workspace by assignee, I cannot see tasks that are unassigned because there is no option to filter for unassigned tasks.
What would the ideal solution look like?
I would like to be able to filter tasks in the Project Workspace by selecting "Unassigned" in the Assignees filter, possibly showing this option at the top of the resources list.
🤖 Submitted via SCOPEY on 2026-07-14
Klient tasks, deadlines, and milestones are managed separately from users' Outlook calendars. This requires users to switch between systems to manage their workload and can result in missed deadlines, scheduling conflicts, and duplicate tracking of project commitments.
Desired Outcome:
Create a bi-directional calendar integration between Klient and Outlook that allows users to view project deadlines, milestones, and assigned task due dates directly in a calendar view. Users should be able to synchronize Klient deadlines to Outlook and view Outlook calendar events within Klient. The solution should support automatic updates when dates change, filtering by project, visual distinction between meetings and project deadlines, customizable reminders, and navigation between calendar entries and related Klient tasks.
Current Workaround:
Users manually review task lists and project schedules in Klient while managing their daily activities in Outlook. Many create manual Outlook appointments, reminders, or personal task lists to ensure project deadlines appear alongside their meetings, resulting in duplicated effort and outdated information when schedules change.
Task dependencies are critical for schedule management but currently require users to open task details to create or modify predecessor relationships. This adds unnecessary clicks, slows schedule development, and makes dependency management difficult for larger projects with numerous tasks. Users cannot easily visualize and manage task relationships while working directly in the Timeline or Gantt view.
Desired Outcome:
Enable users to create, edit, and remove predecessor relationships directly from the Timeline and Gantt views. Users should be able to connect tasks visually using drag-and-drop actions, view dependency lines between tasks, and quickly modify dependency types and lead/lag values without opening task details. Changes should immediately update the schedule and display impacted tasks. Visual indicators should highlight dependency conflicts, broken links, or scheduling issues, allowing users to build and maintain project schedules efficiently from a single planning interface.
Current Workaround:
Users must open individual task details, navigate to dependency fields, and manually enter or modify predecessor information. When managing multiple dependencies, this requires repeatedly switching between schedule views and task details, making schedule development and maintenance slower and more cumbersome.
As we add more functionality and head to the AI licensing it becomes very cost prohibitive to put a timesheet only user on a $79 a month plan. Utilizing PMs to enter timesheets weekly is not a productive use of their time.
Desired Outcome:
The idea is to create licensing tiers based on functionality. For example, timesheet-only users are assigned a basic license at a lower cost per user/per month
Current Workaround:
Project managers enter time for subcontractors
Currently on some of the date pickers I can click on "today" to go directly to the current date. On other date pickers the "today" shortcut is not available.
Desired Outcome:
Use everywhere the same (newer (SLDS)) date picker.
Current Workaround:
Click multiple times to switch from an old date to a new date.
Does Klient have plans to integrate Planny1 with Teams?
Desired Outcome:
I would hope to have a work flow similar to the Slack integration.
We would like to set a dependency task to trigger once the final hours have been approved on a time sheet rather than being linked to a due date. We have tasks that are sometimes cancelled, moved or completed after or before the actual due date and so the dependency task would therefore be triggered too early or too late.
Desired Outcome:
would like to be able to set a dependency to trigger when the final hours of a task have been approved rather than a date.
Title: Allow restricted editing of timesheet comments after submission/approval
Category: Time & Expense
What problem does this solve?
Today, when I try to update timesheet comments after submission or approval, I cannot because the system locks the comments. This creates issues when comments need to be corrected or updated for accuracy, especially since these comments are used in the later generated invoice.
What would the ideal solution look like?
I would like to be able to edit timesheet comments after submission or approval, but only for users with specific permissions. These updated comments should also populate the invoices generated later.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 22/04/2026
Title: Add task name to mass timesheet approval screen
Category: Time & Expense
What problem does this solve?
Today, when I try to approve timesheets in bulk, I cannot see the task name associated with each entry. This makes it difficult to ensure accurate approvals without additional context.
What would the ideal solution look like?
I would like to be able to see the task name displayed alongside each timesheet entry in the mass approval screen, so I can approve or reject entries with all necessary information in one click.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 3/31/2026
Title: Allow Team Leads to manage timecards for their team
Category: Time & Expense
What problem does this solve?
Today, when I try to manage timecards for my team, I cannot submit or edit timecards on behalf of team members, which limits efficiency and creates delays.
What would the ideal solution look like?
I would like Team Leads to be able to submit and edit timecards for all team members on their team.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 6/11/2026
The addition of timesheet groups in 51.3 was exciting until we learned it can only group by project+task, to help group lines added from calendar.
Desired Outcome:
It would be more helpful to project managers to group by project, including lines from all tasks in a group.
Current Workaround:
custom reports
When calendar events are pulled into the time sheet, every meeting still creates a separate row, resulting in 50+ lines per week for users with many meetings (some consultants have 1000+/quarter). The 51.3 "group by row" improvement is visual only — lines with the same project + task should actually merge: hours summed and note fields concatenated (commas). Should be a configurable setting since users tracking billable time may want separate lines.
Title: Dark Theme for All Timesheet Views
Category: Time & Expense
What problem does this solve?
Today, when I try to use the timesheet, I cannot because there is no dark theme option, which makes it harder to use in low-light environments and can cause eye strain.
What would the ideal solution look like?
I would like to be able to enable a dark theme across all timesheet views, including mobile, desktop, weekly, and daily views.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 4/16/2026
The new timesheet grouping consolidates rows that share the same task into a single line. Users who track at the project level want an additional grouping mode that rolls entries up by project with a subtotal of hours per project, so a consultant can see total hours booked against each project for the week at a glance. Should coexist with the existing task-level grouping.
Desired Outcome:
Extra button on top of my timesheet. to be able to group by project or by project and task.
Current Workaround:
Custom report
Currently, if a user edits their timesheets from the My Timesheet page, if they add lines, edit times and notes, and forget to save before clicking away from the page (let's say to another page in Salesforce), they get no notification that they have unsaved entries and that they should save their timesheet before doing anything else.
Desired Outcome:
If anything in my timesheet is not saved, I should get a pop up notification if I attempt to move from that page.
Allow users to log time for the full week at once in the mobile timesheet. (22 votes)
Today, when I fill in my timesheet I often have to enter the exact same hours, notes, or project/task across several lines and days within the same week — and I have to re-type each one by hand. There's no way to copy one entry and reuse it. "Copy Previous Week" doesn't help, because my time isn't the same from one week to the next; the repetition happens inside the current timesheet. It's slow and tedious.
Desired Outcome:
I would like to be able to copy and paste time entries right in the timesheet — a single cell, a whole row, or a whole column — using either right-click or the keyboard. Copying an entry should bring its note along with the hours, and ideally let me copy a project/task onto another line too. It would also help to fill one value across a row or down a column in a single action, and to undo a change if I make a mistake. Basically, make entering time as quick as it can.
We have individuals that put time against 20 plus projects in a week. The ability to sort on the timesheet and group by Account would allow them to easily find a project entry and add time during the week.
Desired Outcome:
I would like to be able to easily find a account and or project that is saved on my weekly timesheet to make time entry easier and ultimately faster.
Current Workaround:
Manually scroll through the list of accounts and or projects saved on the timesheet.
Title: Show all available tasks in "Add to Timesheet" popup
Category: Time & Expense
What problem does this solve?
Today, when I try to add time in the "Add to Timesheet" popup on the Calendar module in My Timesheet, I cannot see all the tasks I can enter time against. I need to know the specific task name because it doesn't load all the tasks for me to pick from.
What would the ideal solution look like?
I would like to be able to see all tasks that I can enter time against once I choose the project. The list should respect the "Close for Time Entry" checkbox and adapt to my settings, showing either all tasks in the project or only tasks assigned to me.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 4/20/2026
When I enter time I see all tasks even completed which causes confusion on which task (if they are similar) I need to apply my time to.
Desired Outcome:
Have a filter where you can toggle out the completed tasks to make time entry easier when there are several tasks to scroll through.
Current Workaround:
I have to open the project in a new window to see which ones I have already completed to pick the correct one, then go back to add my time.
Title: Support scheduling based on daily time stamps
Category: Time & Expense
What problem does this solve?
Today, when I try to schedule tasks or activities, I cannot because there is no functionality to base scheduling on daily time stamps.
What would the ideal solution look like?
I would like to be able to schedule tasks and activities using daily time stamps, ensuring precise and efficient time management for all users.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 2026-08-04
Provide built-in reporting and visualization for Klient Surveys (e.g., response summaries, trends, satisfaction scores), so customers can analyze survey results directly within Klient without needing to build custom Salesforce dashboards.
Add an option during the PDF export process to allow users to choose whether to hide specific tasks, such as those marked as "Internal." This feature provides flexibility and ensures sensitive or irrelevant tasks are excluded from the exported document. Proposed Solution 🎯 Objective • Allow users to control task visibility during PDF export. • Ensure tasks marked as "Internal" or other specified criteria can be hidden. ⚙️ Functionality • During the export process, the system will filter tasks based on the selected criteria. • Only tasks that do not match the "hide" criteria will appear in the PDF. • Def
Desired Outcome:
🖥️ UI/UX Design • Add a checkbox or toggle in the PDF export dialog labeled: "Hide Internal Tasks." • If selected, tasks marked as "Internal" will be excluded from the exported PDF. • Optionally, include a dropdown or multi-select field to allow users to specify additional task types or criteria to hide.
Current Workaround:
We collapse the task we don't want to be visible to the customer., but the customer will always see the main task.
Problem:
Today it takes me 15 minutes each day to fill timesheet.
Desired Outcome:
Based on my calendar, email send and slack conversation prefilled my teamsheet for me
Current Workaround:
Old school Manual input
Make a connector for Claude so we can see Klient Data in Claude
Desired Outcome:
I can query Klient data from Claude
Current Workaround:
Export to csv and import
🚫 Problem Statement
Today, when I try to update Salesforce records, I cannot do it directly through agents, which makes the process slower and less efficient.
💡 Ideal Solution
I would like to be able to use Klient MCP to directly update Salesforce records through agents, streamlining workflows and reducing manual effort.
🤖 Submitted via SCOPEY by User on 2026-03-20
Title: Guidey-Assisted Setup in Onboarding Wizard
Category: AI Agents
What problem does this solve?
Today, when I try to set up the onboarding wizard, it requires manual input or uploading of files to create setup items like rate cards or holidays. This process is not fast and can be time-consuming.
What would the ideal solution look like?
I would like to be able to use Guidey to assist with the entire onboarding wizard setup by generating setup items directly from simple prompts, such as creating rate cards or holidays, and validating them before saving.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 4/23/2026
Title: AI Agent for Project Staffing Based on Skills and Availability
Category: AI Agents
What problem does this solve?
Today, when I try to staff my project, I cannot efficiently match team members to tasks based on their skills and availability. This makes it time-consuming and challenging to ensure the right people are assigned to the right tasks.
What would the ideal solution look like?
I would like to have an AI Agent that can analyze team members' skills and availability to suggest the best candidates for each project task. The agent should provide recommendations and allow me to make adjustments as needed.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 2026-04-23
Allow multiple billing contacts to receive invoices instead of only the primary contact. (14 votes)
Support PDF expense attachments correctly in generated invoice documents. (15 votes)
Today, when I try to create invoices for specific Accounts with unique invoicing requirements, I cannot because the system only allows invoicing information (formatting, payment schedule, etc.) to come from the Organization level. This creates inefficiencies and requires custom flows to handle exceptions.
Desired Outcome:
I would like to be able to define whether invoicing information upon invoice creation comes from the Organization or directly from the Account. This should be configurable on a per-Account basis.
Current Workaround:
Custom flows.
We occasionally have projects that are fixed fee/retainer with a single task that should be billed as T&M (e.g., travel task where we bill additional unbudgeted time; a bucket of special projects hours). It would be nice to have a billing option with Project Billing Lines PLUS the option for some tasks on the project to be billed as T&M.
Desired Outcome:
Mixed billing type option; field on the task to indicate it should be billed as T&M.
Current Workaround:
Referencing reports each month for travel time or special projects hours and manually adding them as a line item to invoices. It impacts ~50% of projects.
Title: Add Organization filter to Generate Invoice page
Category: Billing & Financials
What problem does this solve?
Today, when I try to filter invoices on the Generate Invoice page, I cannot filter by Organization. This is challenging because we have many distinct organizations, and the accounting for each is managed by different people. Without this filter, it is difficult to focus on the relevant invoices for a specific organization.
What would the ideal solution look like?
I would like to be able to filter invoices on the Generate Invoice page by Organization, based on the Project's Organization. Ideally, the filter would allow selecting multiple organizations at once.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 5/26/2026
Title: Add Invoice Date Support to Generate Invoice API
Category: Billing & Financials
What problem does this solve?
Today, when I try to set an invoice date using the Generate Invoice API, I cannot because it only supports Start and End Dates. This limits our ability to set correct invoice dates for customers and leverage Klient's Due Date calculation.
What would the ideal solution look like?
I would like to be able to set the Invoice Date in the Generate Invoice API.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 8/11/2026
What problem does this solve?
Currently, linking Klient Invoices to QuickBooks (QB) Projects requires manual project creation in QB, which is time-consuming and error-prone.
What would the ideal solution look like?
1. Leverage the QB Project ID field on Klient Projects that's already available for manual entry, and already automatically linking the QB Invoice with its corresponding QB Project using this ID. 2. Introduce a 'Create Projects' option in the QB integration to automate project creation and linking: If a Klient Project has a QB Project ID, don't create a QB Project. If the QB Project ID is empty, search for an existing QB Project with a matching name and retrieve its ID. If no match is found, create a new project in QB and update the Klient Project with the new QB Project ID.
Current workaround
Manually creating projects and linking invoices in QuickBooks.
Title: Add PO Number and Billing Contact Email to QBO Integration
Category: Accounting Connectors
What problem does this solve?
Today, when I try to sync invoices with QuickBooks Online, I cannot populate the Customer Purchase Order field or the email field on the invoice because these fields are not mapped from Klient PSA.
What would the ideal solution look like?
I would like to be able to map the Krow__PO_Number__c field on the Krow__Invoice__c object to the Customer Purchase Order field in QuickBooks Online and the Billing Contact email to the email field on the invoice in QuickBooks Online.
Current workaround (optional)
None mentioned
🤖 Submitted via SCOPEY on 3/26/2026
Title: Enable bi-directional integration with Sage Intacct for expenses
Category: Accounting Connectors
What problem does this solve?
The current one-way integration (Klient → Intacct) forces teams to manually export expense data from Sage Intacct, adjust it in Excel, and re-import it into Klient PSA. This process is time-consuming, error-prone, and inefficient.
What would the ideal solution look like?
A bi-directional integration that automatically imports all types of Expense Reports and Expense Lines from Sage Intacct into Klient PSA, eliminating manual processes and improving data accuracy.
Current workaround (optional)
Teams rely on manual exports, Excel adjustments, and re-imports to manage expense data.
🤖 Submitted via SCOPEY on 4/23/2026
Title: Enable Sharing of Presets on the My Deadline Page
Category: Klient PSA Basics
What problem does this solve?
Today, when I try to share my custom presets on the My Deadline page, I cannot because the feature to share presets is not available. This limits collaboration and consistency across teams.
What would the ideal solution look like?
I would like to be able to share presets on the My Deadline page with specific individuals, teams, or all users within the company. The creator of the preset should control whether others can edit or only view the shared preset, and admins should be able to manage shared presets and set company-wide defaults.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 4/20/2026
Title: Easy Scheduled Jobs for Snap Workspace
Category: Klient PSA Basics
What problem does this solve?
Users currently need to manually set up flows to handle recurring or scheduled tasks, which is time-consuming and requires technical expertise.
What would the ideal solution look like?
A simple way to create and manage scheduled jobs for Snap Workspace, eliminating the need for custom flows.
Current workaround (optional)
Manually creating flows.
🤖 Submitted via SCOPEY on 3/31/2026
Title: Default Klient Preset for Permission Set Groups with Flexibility
Category: Klient PSA Basics
What problem does this solve?
Currently, if we set a default Klient Preset from the page layout, it applies to all users and locks the preset, removing their ability to change it. This limits flexibility and doesn't account for different user needs.
What would the ideal solution look like?
I would like the ability to assign a default Klient Preset to users based on their permission set group (e.g., "Klient User"). This preset would be automatically selected in the Workspace or Resource Planner for these users, but they would still have the flexibility to change it if needed.
Current workaround (optional)
None mentioned
🤖 Submitted via SCOPEY on 7/15/2026
Title: Enable inline editing for time and date fields in workspace grid
Category: Klient PSA Basics
What problem does this solve?
Currently, editing time and date fields in the workspace grid requires opening the task details, which adds extra steps and slows down the process.
What would the ideal solution look like?
Allow all time and date fields to be edited directly within the workspace grid, eliminating the need to open task details.
Current workaround (optional)
You can open the task panel to edit the fields, which is just one extra click but still slower than inline editing.
🤖 Submitted via SCOPEY on 2026-04-29
Title: Add "with Subtasks" fields for Scheduled and Estimated Revenue
Category: Klient PSA Objects
What problem does this solve?
Today, when I try to calculate Scheduled Revenue, Remaining Scheduled Revenue, and Scheduled Revenue at Completion with subtasks, I cannot because these fields do not exist. Additionally, the new "Estimated Revenue" field on Task Assignments does not roll up to tasks or projects, making it difficult to get accurate revenue data without external tools.
What would the ideal solution look like?
I would like to be able to see "with Subtasks" fields for Scheduled Revenue, Remaining Scheduled Revenue, Scheduled Revenue at Completion, and Estimated Revenue. These fields should automatically calculate values by rolling up data from subtasks, similar to other "with Subtasks" fields.
Current workaround (optional)
We are currently using an external rollups tool to calculate Scheduled Revenue, but it shouldn't be necessary to rely on this.
🤖 Submitted via SCOPEY on 8/17/2026
Title: Add custom fields under task name in planner views
Category: Klient PSA Objects
What problem does this solve?
Today, when I try to view custom fields like task start time and end time in the planner, I cannot because they are not displayed under the task name in any view.
What would the ideal solution look like?
I would like to be able to list custom fields under the task name in all planner views, such as Day, Week, and Month views.
Current workaround (optional)
None mentioned.
🤖 Submitted via SCOPEY on 3/31/2026